First ever project to lay M30 Grade Concrete roads with 780mm Road Crust for strength & longer life. CBR Test & Vibro rolling compaction with leveling & dressing along with lab tests at every layer.
2.8 Kms. of continuous walk-ways, with no vehicular interruption. Hidden & non-glaring LED lights all across. The walk-ways is among the finest features of Crest Greens leveraging you the best of ambient living.
1 Lac square feet of land scaped garden area, with 6 different species of Trees, Plants, Shrubs & Grass. Comfortable park benches designed for human ergonomics, surrounded by lush greenery.
48 CCTV Cameras installed all across the premise. They have been precisely placed to leave minimum blind spots, keeping the overall safety & vigilance in mind.
120 speakers installed all across the township. We understand the importance of relaxation after a hard day's work. Wherever your walk takes you in the premise, the soothing evening music follows you.
40,000 square feet of club house with world class Gym & Jacuzzi. Separate arena for coffee-shop & banquet. International grade swimming pool. All designed & installed by international designers & vendors.
International grade separate sports courts for Badminton, Tennis, Squash & Basketball. World class equipment, apparatus & set-up as we wish the love of sports to roll in your lives.
A beautiful temple inspired by old legitimate architecture. Proportionately designed steps & space, including a small pond. As we say - we must surrender here to retain ourlseves.
An efficient storm water management system with accurate slopes/gradient to prevent floods and enhance ground water levels by Deep Aqua Recharge system.
1453 no. of M25 Grade RCC Drivable Sewer & Drainage chambers with auto-flow system, functionally designed for under land level support.
8 bore-wells with 2 Lac liters of storage capacity, water-treatment plant delivering fully treated water of reduced hardness level (60ppm). UPVC & HDPE 100m main line pipes & 25mm pipes for individual houses.
Havells & RPG cables, each originate & terminate with a safety junction box. A dedicated sub-station with 17 transformers. Top quality instrumentation with underground cabling across the project.